Track Record

Examples of Previous Team Experiences

Track Records – Bid Support

Crane Re-Use (2018)

Offshore Facilities Onshore Dismantling(2022)

Dismantling(2023)

E&I Resources

Our E&I team have experience more than 20 years in-charge Pre-Commissioning and Commissioning. 

  • Unocal Thailand Phase 21,22,23,24,25,26,27, and (PLOCPP-1 BIG Oil Platform)
  • Chevron WHP Stage 3B Total 4 platform M20,21,22,23
  • Chevron WHP Stage 4 Total 5 platform M24,25,26,27,28
  • Chevron WHP Stage 5 Total 4 platform M29,30,31,32
  • Unocal Wellhead Platform Generic (Oil & Gas) Phase 28 and PLOCPP-2 (TOD-2),29 and 30
  • CTEP (Unocal) Era wan Mercury Removal Platform (ERMRP)
  • CTEP (Unocal) Phase 31,32
  • CTEP (Chevron) Phase 33,34,35
  • CVX (CVX Chevron Offshore Exploration and Production Thailand) Phase 36,39,41,42,43,44,45,46,47,48,49,50,51,53, and 59 Jap platform
  • Pear Oil (Thailand) Limited Jasmine Field Phase A, B, B2 C
  • Pear Oil (Thailand) Limited Ban Yen Field Phase D
  • KHL-CARIGALI – HESS Jacket BMA, BLA, SYA and CKR Module
  • PTTEP Wellhead Platform Extension Project-WP9&WP10
  • PTTEP Arthit Wellhead Platform Project Phase 1C (AWP11,12,13 and AWP14) 2010Y
  • BGEP – Hydra PK&SWP Wellhead Platform. (Project Owner BGEP INDIA) 2008 Y
  • HOEC –PY-1 Gas Field Development Project Sun Wellhead Platform. 2008Y
  • CPOC CARIGALI-PTTEPI Operating Company SDN BHD, MDD Platform –CPOC JDA Block B-17 Project. 2010Y
  • CPOC CARIGALI-PTTEPI Operating Company SDN BHD, CPOC JDA Block B-17-01 Field Development Project Phase 4. 2016Y
  • Bahrain LNG Import Terminal Project, GPS GS Engineering & Construction Corp. 2018Y

E&I Resources

Shop drawing Design for fabrication

  • Detail for support fabrication
  • Secondary routing support design

  • Equipment layout detail

  • Data bass controller and Material take off

  • As-built Drawing

Cable tray installation

Conduit Installation

Tubing Installation

Electrical equipment installation

Cable Installation, Wiring and termination

Installation Inspection Check

As-Build, redline mark up.

Hand over installation inspection work package (ITR)

Inspection Test Record Data BasE Setup. (ITR)

Electrical Device tags take off

  • Equipment Installation Check sheet

  • Cable Continue/Insulation resistance test check sheet.

  • Electrical function test check sheet

Instrument Device tags take off

  • Equipment instrument installation check sheet

  • Instrument Calibration check sheet

  • Cable Continue/Insulation resistance test check sheet

  • Tubing Installation, pressure, Oil Flushing test check sheet

  • IO Loop test  check sheet

Pre-Commissioning

  • Check Confirmed sing off installation inspection check record (ITR)

  • Pre Commissioning Test procedure, test package setup. (ITR)

  • Cable Continuity / Insulation resistance test.

  • Tubing Pressure test

  • Oil flushing test

  • Grounding System test

  • Control net Work test

  • PLC,HMI IO Loop test

  • Electrical IO Soft tags test

  • Electrical System Function test

Track Records: Commissioning

Track Records: WHP Preservation/Reuse